Residential remodel client: Advice needed on contracting the preliminary work - Printable Version +- Sup Startup (https://supstartup.com) +-- Forum: Startup Forum (https://supstartup.com/forumdisplay.php?fid=3) +--- Forum: Small Business (https://supstartup.com/forumdisplay.php?fid=12) +--- Thread: Residential remodel client: Advice needed on contracting the preliminary work (/showthread.php?tid=7339) |
Residential remodel client: Advice needed on contracting the preliminary work - Aplus - 07-25-2021 Residential remodel client: Advice needed on contracting the preliminary work 80% of my work is residential remodels, but usually simple jobs (bathrooms, kitchens, new floors, etc). I have a client who wants to open wall space, move plumbing, electrical, etc. I'm more than capable of handling this job as the GC, but I never deal with this much preliminary work, therefore, don't have a contract prepared to cover all the architect meetings, material take-offs, etc. I'm putting a lot of time into this and don't even know if I'll win the bid once the final take-off and drawings are approved to begin bidding on. Thoughts? [link] [comments] |